Dafydd Vaughan
 

Coed Derwen windows fitted in old building & underfloor heating installed in lounge

Final filming for Designer Homes

Furniture fitted in front bedroom, en-suite installation tested before tiling, cupboard doors fitted and front of house painted

Photos from our house extension 11th April 2006

Photos from our house extension April 2006

As i mentioned in my last blog post, we had the film crew from Cheese and Crackers here yesterday.  Andy (producer), Jon Slattery (presenter), Ollie (camera man) and Jamie (sound guy) arrived around midday.  After taking a few panoramic shots of the current state of the building, I was given a wireless microphone and had [...]

Photos from our house extension in March 2006

Photos from our house extension in February 2006

It’s mid week already and i have absolutely nothing to show for it!  I have loads of work to get on with, I just can’t seem to be bothered to do it.  I’ve pretty much finished graphics [cs217] coursework (although i have a few tweaks).  I’ve done the maude [cs213] lab assignment for this week, [...]

First floor RSJs and beams go in

Pages: 1 2 Next »

Hi, I'm Dafydd (or Dai) and this is home to my collection of photos, rants, raves, and the occasional semi-coherant ramble.

If you want to find out more about me and what I'm up to, check out my profile.

Future of Web Apps - Dublin 2009 Future of Web Design - London 2009

More from Me